Skip to main content
Live demoEvery capability · read-only
Shape this workspace

Every plan includes every capability. Companies switch off the parts they do not use, and Tiercord keeps tracking them either way.

Brentwood Towers – Phase 2

Pending

Disputed $12,400.00 · referred by the counterparty · Coastal Drywall Ltd.

Dispute
What this adjudication is about.

Notice given

Sep 11, 2026

Adjudicator appointed

Sep 13, 2026

Materials due

BC CPPA Section 25 (enacted, not in force)

Sep 17, 2026, 05:00 p.m. PT

Determination due

BC CPPA Section 30(1)(b) (enacted, not in force)

Oct 18, 2026, 05:00 p.m. PT

Notes

Coastal disputes the level 7 remeasure. Riverbend's position: 990 m² double-counted against draw 4.

AI adjudication assistant
A first-pass adjudication submission drafted from this dispute’s contract, invoice, notices, payments, and audit trail, grounded only in the recorded facts.
This is an AI-generated draft, not legal advice. A lawyer must review and settle it before it is served or filed.

Saved draft

ADJ-BRENTWOOD-COASTAL-written-submission.pdf

Drafted Sep 14, 2026, 10:05 a.m. PT · Tiercord AI

SHA-256 b7c436cf45aff778d2c8d9570fa35498ff6cf42f942757d808f0f247633bb958

Download PDF

Included on your plan.

No saved draft to show

Generate a first-pass written submission you can review, refine, and settle with counsel.

Record bundle
BC CPPA Section 25 (enacted, not in force)
Re-assemble after adding new notices or payments. Previous bundles stay accessible by their document ID. Review which audit summaries to disclose to the responding party before assembly.

Current bundle

ADJ-BRENTWOOD-COASTAL-record-bundle.zip

SHA-256 234c7574e903833f704c9af008ab353bfadc73cc193377474f9c20f8a79bf223

4.5 MB · assembled Sep 13, 2026, 09:18 a.m. PT

Download

What will go into the next assembly

  • Subcontract / head contract

    (contract linked but no PDF attached)

    The contract is a mandatory exhibit with the materials (BC CPPA Section 25 (enacted, not in force))

  • Disputed invoice

    CDW-2026-04-11 · $28,560.00 (Partially paid)

  • Notices of non-payment

    0 notices on the chain

    No notices linked. Verify if any should be

  • Payments touching this dispute

    1 payment (in & out)

  • Statutory declarations

    0 on the contract

    No statutory declarations on file (typical for early-stage disputes)

  • Audit trail

    Choose all company event summaries or summaries selected for this dispute

    Summaries retain stored hash references but omit private hash inputs. The exported summaries cannot independently replay the audit chain. Review the selected disclosure before sharing.

Heads up before assembly: No contract PDF attached
Project

Brentwood Towers – Phase 2

Ref RB-2025-014

4567 Lougheed Hwy, Burnaby, BC

Completion: (not recorded)

Open project
Responding counterparty

Coastal Drywall Ltd.

Notices: billing@coastaldrywall.com

Sample adjudication · Tiercord